The meeting will give an overview of the status of the ESSnuSB project and the EU/Horizon2020 Design Study application under preparation.
The proposed ESSnuSB infrastructure consists of the ESS Linear Accelerator with some added components, an Accumulator and a Target located at ESS, that will be used to generate a very intense muon neutrino beam; a smaller neutrino Near Detector, located near ESS in Lund, used to monitor the neutrino flux; and a Megaton water Cherenkov neutrino Far Detector located in the Garpenberg mine in Dalarna, 540 km north of Lund, used to detect and identify electron-neutrinos that result from the oscillation of the muon-neutrinos generated at ESS. The simultaneous production of spallation neutrons using the ESS accelerator shall not be
reduced or affected in any other way. The water Cherenkov detector will also be used to measure neutrinos from supernovae, from the sun and from the atmosphere as well as to search for proton decay. The scientific aim of the infrastructure is the discovery and
measurement of CP violation in the leptonic sector, which is a necessary ingredient in any explanation of the observed dominance of matter over antimatter in the universe. The unique feature of the proposed infrastructure, as compared to the other major neutrino Super Beams proposed in the world, LBNE in the US, LBNO in Europe and Hyper-K in Japan, is the significantly higher power of the ESS proton accelerator, making possible to place the detector at the second oscillation maximum, where the relative amplitude of the leptonic CP violation signal is higher than at the first.
The meeting will be held at CERN, in the IT Auditorium ( Bat. 31-3-004 ) next Monday 26/5 14.00 hrs - Tuesday 27/5 12.00. Remote participation via Vidyo will be possible via the link http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Welcome31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
Prof.Sergio Bertolucci(CERN)
2
Current situation of ESSnuSB and status of WP1 Management31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
Prof.Tord Ekelof(Uppsala Uiversity)
Transparents
3
Leptonic CP violation and matter/antimatter asymmetry in the Universe31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrSilvia Pascoli(Durham University)
Transparents
4
WP4 The Target Station31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrNikolaos Vassilopoulos(IPHC, CNRS)
Slides
5
The ESSnuSB target31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrCris Densham(STFC)
Transparents
6
A Solenoid Hadron Collector31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrRemo Maccaferri(CERN)
Transparents
7
WP5 Detector Cavern31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
WP3 The Compressor31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrElena Wildner(CERN)
Transparents
9
Status of the US Long Baseline Neutrino Experiment (LBNE) project31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrJim Strait(Fermilab)
Transparents
10
The LBNE Water Cherenkov Detector Project31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrJim Strait(Fermilab)
Transparents
11
The CERN Super Proton Linac (SPL) project and ESSnuSB31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrRoland Garoby(CERN)
Transparents
12
ESGARD and H202031-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrRoy Aleksan(CEA Saclay)
Slides
13
Discussion31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
19:15
Walk to RestaurantFrom Sal F
From Sal F
19:30
DinnerRestaurant Nirvana, 375 Route de Meyrin, 1217 Meyrin, 200 m from CERN Entrace A, direction Meyrin
Restaurant Nirvana, 375 Route de Meyrin, 1217 Meyrin, 200 m from CERN Entrace A, direction Meyrin
375 Route de Meyrin, 1217 Meyrin, 200 m from CERN Entrace A, direction Meyrin
WP2 The ESS Linac Upgrade31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrDavid McGinnis(ESS)
Transparents
15
Tests of the spoke-cavity power upgrade31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrSébastien Bousson(IPN Orsay)
Transparents
16
Status of the ESSnuSB Design Study application to EC/Horizon2020; deliverables, milestones and funds requested31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
Orateur:
DrMarcos Dracos(IPHC-IN2P3/CNRS)
Slides
17
Discussion on the role of each of the participating institutes31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
10:40
Coffee break31-3-004
31-3-004
CERN
18
Next steps towards the EU Design Study application to be submitted 2 September 201431-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT
19
Discussion and Conclusions31-3-004 (CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT)
31-3-004
CERN Remote connection via http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=Dy1hhy2iYqwT