22–24 avr. 2008
Palais Neptune Conference Center, Toulon
Fuseau horaire Europe/Paris

The electro-optical cabling system for the NEMO Phase-2 tower

23 avr. 2008, 11:40
15m
Salle Colbert (Palais Neptune Conference Center, Toulon)

Salle Colbert

Palais Neptune Conference Center, Toulon

Palais des Congrès Neptune Place de Besagne Centre Commercial Mayol
Contributed talk Parallel Session on Engineering for deep deployment neutrino telescopes Parallel session on Engineering for deep deployment neutrino telescopes

Orateur

Dr Antonio D'Amico (INFN-LNS)

Description

The cable system layout for the NEMO Phase-2 project has been studied starting from the experience obtained after NEMO Phase-1 deployment. The aim has been to improve the reliability and simplify the integration procedures of the system. This has been attained by reducing the number of optical fibers in the backbone and by an improved layout of the optical links in the cabling. Moreover an optimization in order to reduce the cost, in view of a large scale industrial production, has been performed. The design characteristics of the cabling system proposed for the detector line are presented.

Auteur principal

Dr Antonio D'Amico (INFN-LNS)

Documents de présentation