22–24 avr. 2008
Palais Neptune Conference Center, Toulon
Fuseau horaire Europe/Paris

A comparison of AC and DC power feeding systems based on the NEMO experiences

23 avr. 2008, 12:15
15m
Salle Colbert (Palais Neptune Conference Center, Toulon)

Salle Colbert

Palais Neptune Conference Center, Toulon

Palais des Congrès Neptune Place de Besagne Centre Commercial Mayol
Contributed talk Parallel Session on Engineering for deep deployment neutrino telescopes Parallel session on Engineering for deep deployment neutrino telescopes

Orateur

Rosanna Cocimano (INFN - LNS)

Description

The NEMO Collaboration is involved in an intense activity to develop, apply and test technical solutions for an underwater laboratory with two prototypes called NEMO Phase 1 and NEMO Phase 2. In this framework both options of AC and DC power feeding systems have been explored. The design, realization, test and operation of NEMO Phase 1 AC electrical power and control system were carried out and concluded. The operational experience with this system will be reported. Presently the design and realization of the DC power system of NEMO Phase 2 is under way. Both these systems are described and compared, with a special focus on the results of NEMO Phase 1, on the tower power subsystem, and on the long term high pressure tests that have been carried out on the electric and electronics devices.

Auteur principal

Rosanna Cocimano (INFN - LNS)

Documents de présentation