Preparation of uniform prototype

Europe/Paris
Workshop (IJCLab)

Workshop

IJCLab

Participants: Roman, Jimmy, Vincent, Jérôme, Adrián, Dominique, Dirk, Taikan

News from IJClab (Roman)

  • HV Kapton
    • 25 ordered, will be delivered the 30/10.
    • small changes: no more sidebands, vias are covered, longer connection strip, thickness 310±10μm.
    • price ~ 3k€ ~ 120€/pce
  • PCB Metrology before cabling
    • 25 pces ~ 1 day of measurement.
    • Mechanical measurement shows deformation of 200 (typical)–400μm
      • Vincent: ➞ 100μm additional space on the edge of wafers
    • Adrián:
      • Mecha. meas. show only the deformation of the PCB under its weight ~ almost always the same for all ➞ no information.
        • 💡 Compare by reversing the PCB (for a couple of them)
      • Atypical one 400μm but reversed deformation.
  • DAQ
    • New DAQ computer with plenty of disk
      • Disk server (rack) still avail. until failure...
      • Window 11 : will need test !!!!
  • Wafers
    • 22 wafers : tests in IJCLab.
    • last time currents were a factor 2 below HPK.
    • Will need to find a slot; 
      • Vincent: Yukun could help.
  • Cabling
    • Dominique: machine slots: within next 2 weeks
      • couple of days of prep. + 1 day.
        • soldering of connectors by hand
    • ➞ End of October
    • NEEDS urgently the resistance values for optimal TDC response.

➞ Material send to IFIC beg of November :

DMLab (Dirk)

  • 3M stopped the production of A4 sheets of double-side tape.
    • continues rolls only: 3m×60m , 5k€ pce !! 
    • but they are reactive!
  • looked for spare market & found 3Market.de :
    • 50 sheets in stock… 
    • 29 pces ordered
    • also sold in ≠ thickness by steps of 50μm.
  • new design for holes.
    • ⬌ IFIC

News from IFIC

  • Wafers measurements (Japan ones to be brought by Taikan)
    • 2 days / sensors ➞ 20–30 by February
  • 3M tape:
    • new holes pattern ➞ DMLab
      • but C. Orero in "inter-contract"
    • Manpower: ≥ end November.
      • +1 students in Jan.
  • Glue: 
    • H20E: available (10 oz) but expires in March, Enough for 10 mod.
      • last time: needs to 2 steps, fast heating (140 °C), 1 days of preparatation
    • Mono-component 
      • Much less cumbersome. 
      • worked fine for ECALp; 1‰ missed dots (smaller, too long in syringe)
    • now: 80–100 °C longer time (2-3h)
      • Dirk + Dominique: is lower temp+longer heating better?  lower temp is better....
  • Metrology: 2–3 months ➞ end feb.
  • Assembly / Hybridization
    • Tests in Jan. with 2 modules mono-component glue.
    • Prod. (10) in March

Wafers:

  • IFIC: 7 
  • IJClab 4 (from 12), now at IFIC
  • LLR: 22, now at IJCLab
  • KEK 10
  • Kyushu 8

tot = 11+4+22+10+8 = 55 ➞ enough for 12.75 cards
Roman: @Taikan do you have a spare 500μm wafer?  Taikan prefers to keep margins
➞ make 12 ASUs

DAQ:

  • SLBoards OK ?
    • Needs adaptation for HV + Probe.
  • 1–2 ASU ➞ IFIC

Support & Logistics:

  • Transport boxes must be purchased / built.
  • New rails will be produced.
  • W plates are unchanged.

 

Il y a un compte-rendu associé à cet événement. Les afficher.
    • 14:00 14:20
      Overview 20m
    • 14:20 14:40
      Status at IJCLab 20m

      Therein
      - HV KApton
      - Metrology
      - Next steps

      Orateur: Roman Poeschl (IJCLab)
    • 14:40 15:00
      Hybridization 20m
    • 15:00 15:15
      DAQ: HW + SW 15m
    • 15:15 15:25
      Supports 10m
    • 15:25 15:45
      Commissioning 20m