GRAiNITA meeting
Virtual
You can join this meeting by clicking the follawing zoom link:
https://cern.zoom.us/j/62961512598?pwd=dklNZ3JxNk5NSUx1OXh5dzNOR0NVZz09
-
-
15:00
→
15:05
Installation of the meeting 5m
Summary:
Timetable:
— 11/06 AM: Registration of computers and recpetion of dosimeters
— 11/06 PM: Installation at the Lab and preparatory tests with the Drift Chambers and the Calo electronics.
— 12/06 AM/PM: installation in the beam zone. Close to final setup.— 15/06: Beam On.
— End date: the data needed can be registered
Minimal beam characteristics:
— Tunable beam down to 100 Hz in 100 cm^2.
— We want much more but can keep in mind that option. Few Hz on GRAiNITA can be useful to make sure we record all events synchronously.Acquisition rate:
— Jihane to check the 600 Hz acqusition rate limit .
— Clermont to operate the wavecatcher accordinglyAdditional / alternative triggers:
— 3x3 cm^2 possible to manufacture at Orsay.
— Clermont to propose early in the week of 20/05 an accommodation / send the constraintsMechanics/ alignment at large
— Setup finalised in Clermont the week of the 20/05
— Measurement of the alignment troll / box.
— Target: 0.5 mrad.
— Geometry of the DC [get pictures from Yury / Loris (SM)] and accommodation of the systems.Synchronisation of the computers:
— Test in Orsay
— Follow-up in Clermont.
— MH to ask Manuel Guttiere about their strategy back in time.Analysis Software:
— Hervé’s sw as a starting point
— exchange next week to converge on the basic script / meeting 24/06 15:00. -
15:05
→
15:15
Orsay test-bench results 10mOrateur: Ianina BOIARYNTSEVA (IJCLab)
-
15:15
→
15:25
Clermont test-bench results 10mOrateur: Magali Magne (LPC Clermont Ferrand)
-
15:25
→
16:15
Test Beam preparations 50mOrateurs: Dominique BRETON (CNRS / LAL ORSAY), Giulia Hull (Université Paris-Saclay, CNRS/IN2P3, IJCLab), Herve Chanal (LPC), Jacques Lefrancois (ijclab), Jihane MAALMI (CNRS-LAL), Magali Magne (LPC Clermont Ferrand), Marie-Hélène Schune (IJCLab), Stephane Monteil (Laboratoire de Physique de Clermont - UCA/IN2P3)
-
What do we know of the beam? 5m
-
Discussion on the WaveC veto signal 5m
-
The trigger options 5m
-
News about the mechanics for the test beam 5m
-
Preparation of scripts 5m
-
Timetable and travels 5m
-
- 16:15 → 16:35
-
16:35
→
16:40
A.o.b. 5m
-
15:00
→
15:05