- Readout architecture, Jean
- recently solved last issue on the design methodology
- expect to get accurate results on space required, hit rate within 1-2 weeks
- for power estimation, still missing power-charac of one of the central cell (Mueller cell)
- => next meeting
- Tests, Jerome & Andrei
- Discussion on list of plots for the corrivreckan analysis => to be checked by analysists
- Investigation on leakage current, for irradiated sensors with possibility to compare pixels
- CE65v2, Andrei
- again a number of corrections done on v2 to match requirements for submission
- required to re-include CE65v1 (versions A, B, C) with new metal layers (for IO), pixel matrices not-modified
- Isabelle is performing simulation after exctraction => then writing of documentation
- MOS-T design, Szymon
- final checks on-going to exclude any possible serious issues
- start of final submission process with foundry, Sept. 12th
- possible continuation of design in the following month
=> NEXT MEETING: Wednesday 21 September, 10h30
Il y a un compte-rendu associé à cet événement.
Les afficher.