Status of the SLBoard v2.
Status of the FEV10/11 integration into the SLBoard system.
Status of the FEV12 wafer gluing.
Status of the COB encapsulation + wafer gluing.
Status of the FEV13 integration on the new system.
Status of the Mechanical structure.
Status of the cabling + patch pannels.
Status of the Commissioning procedure.
Transport
Attendance
Discussions
List of publications
TB2017: NIMA publication + 4 proceedings
TB2019: 1xIEEE, 2x CHEF proceedings