DESY2018-06 prep meeting #0

Europe/Paris
https://vidyoportal.cern.ch/join/IGqhOM6Arg (Vidyo)

https://vidyoportal.cern.ch/join/IGqhOM6Arg

Vidyo

Please join the meeting by clicking this link: https://vidyoportal.cern.ch/join/IGqhOM6Arg If you want to join by phone, please use one of the phone numbers listed in the link below: http://information-technology.web.cern.ch/services/fe/howto/users-join-vidyo-meeting-phone and enter the meeting extension 1010377183 in order to join. Thank you for using the CERN Vidyo service!
Vincent Boudry (LLR - École polytechnique, CNRS/IN2P3)

Dates

  • Monday, June 24th – Sunday, July 7th
  • See http://particle-physics.desy.de/sites/site_particle-physics/content/e252106/e261123/infoboxContent297791/Testbeam_schedule2019v5_ger.pdf
  • Possibility to use the EUDET telescope

DAQ

  • use of Telescope ?
    • EUDET+TLU ?

LAL-status

  • ASU's
    • FEV-BGA
      • 1 FEV11
      • 2 FEV12
    • FEV-COB
      • 1 equipped
      • 2 to be bounded @ CERN in April
      • Cosmics seen
        • Pedestal behaviour
    • Wafers ?
      • 1 on each to start with = 4 wafers
  • SL board's
    • Kapton + PCB
    • USB readout
    • FW: prog on going
      • SK2
        • Config on 8 SK2 next week
      • RO and control
      • LabWindow
        • C language
        • integration with PYRAME ?
      • Core Module: later..
    • Clock through CORE module
      • To be tested
      • works on other experiments (C3 ATLAS)
  • Mechanical set-up
    • for 7 ASU's
    • To be started soon
    • Can it be adapted to hold FEV13's boards ? (see Taikan's presentation)
      • Note: tere is one board in LLR for measurements
  • SMBv4
    • GradConn connector to replace spring contact on test bench
      • Better contacts
  • Gluing in LPNHE
    • when ?
  • 4 Layers
    • LAL
      • 2 wafers 550μm
    • LPNHE + LLR
      • 2+2 against TLU ?
    • 10 needed for full 4 boards
      • Can be completed after tests
        • At least in Kyushu
  • Physics program
    • low E (puch through)
    • high E (W)
  • Milestones
    • A list of milestones should be made to check critical delays

FEV13-Jp (Kyushu plans)

  • MEXT Status
    • Broadcast not so good
      • no announcement of hosting
      • interest of Jp gvt → start disc. with other gvt's
    • Return from France
      • IN2P3 & Gvt positive; CEA negative
      • but Physicist (first) disapointed
  • FEV13-Jp setup
    • Carbon frame in prep.
      • diameter ≠ (3mm instead of 4mm)
    • TLU test started
    • Support structure
      • Horizontal not OK for vert.
    • 5 Slabs
      • 1 @ LLR
      • 4 @ Kyushu
    • Transport
      • Box from LLR ?
      • New ones ?
    • DAQ
      • TLU
  • Physics program
    • S/N ratio ~ OK
    • Scan of individual thr.
    • TDC
    • 500 μm
  • Test of small sensors
    • PSD & APD
      • Prelim results
      • DAQ ?
        • Testboard
        • no telescope
          • Position from Multiple layers
  • FEV13 results
    • S/N ratio ~ 45
    • 1 working slab @ CERN

LLR

  • Stack needed ?
    • Readout
    • HV
  • Not setup for test
    • Support for installation / debugging
  • Mechanical Set-up ?
    • Common box ?
      • ≥ 1 month

Organisation

  • Who
    • LAL
    • LLR
      • VB for ≤~1 week.
      • PhD  student ?
    • Kyushu
      • opt 1
        • 2nd week
      • opt 2
        • 2 weeks + 1 week in LLR (17–23/06)
  • Roles
  • Logistics
  • DAQ
    • EUDAQ + TLU

For next meeting

  • Discussion around CALICE meeting
  • Review ~ 1 week after

 

Il y a un compte-rendu associé à cet événement. Les afficher.
    • 09:30 09:45
      In and outs of the DESY2019-06 beam tests 15m
      Orateur: Vincent Boudry (LLR - École polytechnique, CNRS/IN2P3)
    • 09:45 10:05
      Testbeam 2019 – Status at LAL 20m

      Status of testing, production and plans for BT

      Orateur: Roman Poeschl (LAL Orsay)
    • 10:05 10:25
      FEV13-Jp plans 20m

      Status of testing, production and plans for BT

    • 10:25 10:30
      FEV13-Fr & Long Slab plans 5m

      Status of testing, production and plans

    • 10:30 11:00
      Discussion on program and organisation 30m

      • Beams & Physics requirements
      • Setup requirements
      • DAQ requirements
      • Logistics
      • Participants and Roles