BT2015 Analysis meeting
https://vidyoportal.cern.ch/flex.html?roomdirect.html&key=56nCEXSe449N
- Andreas: asked about a SKIROC positioning on a board, for a verification of the a chip size (7.1 x 8.5 mm2) and a material composition of a BGA packaged chip. This is needed for the GEANT4 simulation (which will be really detailed!) To be checked with electronics engineers.
- Vladik: reported on news on retriggers and suggested a (difficult?) puzzle to solve. I've just updated my slides and included the most recent plots, as promised. Together with the plots from the previous presentations, they should be sufficient to solve the puzzle. Please, try it, there is one step to make to understand what is going on in the retrigger, eg. why there are many channels fired (plane events) but not necessarily all 64, as it should be in case of eg. a strong pick-up noise.
- The new chip production for CMS and ILC is going to be submitted soon.
- Taikan can not attend the meetings on Thursday until mid-February. So, we shifted our next meeting to Wednesday, 27 Jan, same time 10:30 CET.