Preparation of uniform prototype

Europe/Paris
Workshop (IJCLab)

Workshop

IJCLab

Description

https://cern.zoom.us/j/


64008143327?pwd=ndOmKBQh1HxAkAsQH6jl6Vl4bcFATm.1 

Participants: 

Roman (RPL), Adrian (AIS), Dirk (DZS), Jimmy Jeglot (JJT), Dominique Breton (DBN), Jihane Maalmi (JMI), Taikan (TSA), Vincent (VBY)

News (Roman)

SPS will be overbooked ➞ 1 week max. Pack all DRDCalo in a block.

Thomas Bergauer ➞ go early = ??? may

Research board last week. Tech Board this week. (Update 05/12 VBY: received and responded to Gabriella Gaudio, DRD6 TB coordinator).

HW

FEV

15 boards cabled ➞ metrology at IJClab (Alice)

No yet electric tested.

DBN: Saturation of HV seen in 2022 BT: will test with HV pulses.

HV kaptons

25 received. To be looked at.

SLBoards

  • they need to be modified:
  • 1 ready ➞ electric test of 15 boards
  • 2 needed for IFIC ASAP

Testing:

Electric testing:

  • with a single SLboard

Analogue Probe

FEV2.1 from March: Xin and Taisei, Yukun.

1 faulty diode ➞ to be repaired.

Source

Xin has the authorisation; for others: to be checked.

Assembly

1–2 slabs in January.

Minimal tests

February for production

News from IFIC

Stencil 3M

  • design done ➞ DZS

PCB

Expertise from Lab Circuit: preconise pre-baking PCB before soldering to remove humidity.

Metrology in IFIC: 

  • not fully compatible.
  • long ➞ quick test only.
  • if some board early ➞ more tests

Glue

mono component available. ref. 9410

with lower curing time.

Wafers

30 Wafer at IFIC from IJClab, LLR (⊃  19 from Tokyo)

52 in total

Testing with probes : make scratches.
Should not do too many.

(1 for LUXE was broken in cleaning).

C2V curves. Edge effect seen (pixels on the edge have higher capacitance).

Measurements of Vd.

ASU tests

Set-up to do, but …

Detail in IJCLab

To be decided IJCLab or IFIC.

Servers:

10 TB old server

4 Tb on new on…

100 TB on DRD EOS space

DAQ

  • TDC enabling to be added in control panel.
    • [ ] Decoding of TDC : what to display ?

AoB:

When is the next point ?

  • Thursday 18, 16h CET.
    • late for Taikan,
      • but next meeting = brief update on the material availability only.
      • Keep a discussion on the Vd for the next meeting at earlier time

 

 

Il y a un compte-rendu associé à cet événement. Les afficher.
    • 16:00 16:20
      Overview 20m
    • 16:20 16:40
      Status at IJCLab 20m

      Therein
      - HV KApton
      - Metrology
      - Next steps

      Orateur: Roman Poeschl (IJCLab)
    • 16:40 17:00
    • 17:00 17:15
      DAQ: HW + SW 15m
    • 17:15 17:25
      Supports 10m
    • 17:25 17:45
      Commissioning 20m