Present: Pascal, David, Giovanni C, Paul, Philippe, Luc, Julien, Marc
General news:
- Collaboration is pushing to define the qualification process and qualify asap what is possible to qualify now
- We could qualify our testing infrastructure
- Gluing tool end of january
- We should start measurements on the sensors soon
Wirebonding:
- CTA still critical
- Temporary solution with a portable air filter foreseen this week
Assembly
- Table expected in january
- Metrology pump to be installed. Verified no oil
- Prepare a presentation about the infrastructure
Testing
- LV distribution: all material is there to design and produce the distribution board, Eric is going to prepare the component to design the board
- Support v2 for the climate chamber: waiting for material
- TEF1001 debugging in progress: DC-DC 3.3V unmounted, now CPLD is OK
- KC705
- Techway FMC+ cards ordered 2x
- Next step: debug module 5
X-Ray box
- Box delivered
- Lead not arrived yet, expected last week
- Coldbox: test if it fits in the xray box + look at the design from IRFU.
YARR:
- Paul is continuing the investigation around YARR s-curve fit, apparently a systematic ~100e undershoot is present
Sensor in PDB:
- Find a spot to use the program that Hua explained and insetrt all data