Present: Pascal, David, Giovanni C, Paul, Philippe, Yann, Julien
General news:
- New probe station arrived
Wirebonding:
- CTA still critical, no foreseen date
- Temporary solution with a portable air filter foreseen this wed
- Ask IRFU for the vacuum chuck
Assembly
- Table expected in january
- Metrology pump to be installed. Verified no oil
- Prepare a presentation about the infrastructure
Testing
- LV distribution: test of the cable soon. Eric is going to prepare the component to design the board
- Support v2 for the climate chamber: waiting for material
- TEF1001 debugging in progress: DC-DC 3.3V unmounted, now CPLD is OK. FPGA is OK! Card recovered
- KC705 broken, FMC not possible to repair
- Techway FMC+ tested, they are OK
- Debug module 5:
X-Ray box
- Lead arrived.
- Coldbox: test if it fits in the xray box + look at the design from IRFU.
Diverse:
- Find an instrument to track tasks
- Produce boxes to transport SCC
- Modify the IRRAD support