Meeting ITk LPNHE
→
Europe/Paris
Higgs 12-22-2-28
Higgs 12-22-2-28
, ,
Description
Join Zoom Meeting
https://cern.zoom.us/j/94940524377?pwd=dnI4NnZUWGNMN1ZpRFJncFU1ZlMrQT09
Present: Yann, Pascal, Julien, Paul, David, Luc, Giovanni, Artur
General news:
- Atlas upgrade week upcoming
Wirebonding:
- Clean room still not available. Prediction: end of November
- Tools order is ongoing.
Assembly
- Pump order, no news
- Metrology pump to be installed. We have a doubt about the oil discharge of the pump, to be checked if compatible with usage in plafond soufflant
Testing
- David started to design the object, but the connectors are hard to find
- TEF1001 and XPressK7 cards damaged during the latest link tests. Needs to be replaced AND repaired
- Paul presented a study on the multimeter resolution: for most of the measurements we can use the fast resolution
- Paul presented a study on the fit in YARR: there is a difference in the threshold result that must be studied further
X-Ray box
- Box delivered
- Lead not arrived yet
- Coldbox assemblage is urgent
Testbeam:
- Artur/Paul/Giovanni went to the 2 nov testbeam
- Artur is reconstructing the data and will present soon
Irradiation:
- Yann designed a new plate for the IRRAD holder designed by Philippe/Marco long ago, it has been produced and used. It is in IRRAD now.
Il y a un compte-rendu associé à cet événement.
Les afficher.