- Beam Test discussions, Sergey, Szymon, Yitao
- telescope seems OK, even with DPTS as trigger (100 triggers/spill)
- during past night, trigger was scintillator (efficiency of tracks on DUT to be studied)
- CE-65 acquisition is relatively slow (only 20 events/spill ~0.7 evts/s)
- potential action would be to reduce the nb of frames (currently 8) before and after
- About timing: CE-65 has the largest time window (~ms) => should not impact detection efficiency
- Sergey can stay up to Monday (but would like to leave before)
- discussion continues over Mattermost channel
- Early analysis by Yitao
- observation of RTS noise (baseline random jumps)
- RTS was also observed by Andrei with lab data
=> suggestion to study this in lab with various read-out frequencies
- telescope seems OK, even with DPTS as trigger (100 triggers/spill)
- MOSS Design, Fred
- layout will be finished only in May ==> submission postponed a bit (no date yet)
- standard cells : layout still to be corrected => still ~1 week of work
- submission will be delayed by verifications (still a lot to do)
- MOS-T Design, Szymon
- Szymon's part will be done before end of May
- pixel have changed with different (front) biasing scheme => involved additional work by Szymon
- also waiting for std cells
- CE-65v2, Andrei
- 1 column (on the left) has diode disconnected from Front-End
=> allow measurement of diode capacitance by comparison with other pixels - Version C (analogue)
- 5 versions (all 3 pitches and hexagonal arrangement) layout, DRC, LVS, all done
- Walter agreed to have the 3 flavours (our A, B, C in v1)
=> still question about which gap to use for version B (was potentially changed in MOSS)
- Version A
- still to be discussed, may not happen before Walter checked Version C
- basic idea would be to add AC coupling to MOSS front-end
- version D is abandoned
- APTS and DPTS will be ported in new version
- 1 column (on the left) has diode disconnected from Front-End
==> Next meeting, possibly next week on Wednesday 11th May