Meeting ITk LPNHE
Join Zoom Meeting
https://cern.zoom.us/j/94940524377?pwd=dnI4NnZUWGNMN1ZpRFJncFU1ZlMrQT09
Presents: Marco, Pascal, Fred, Marc, Luc, Giovanni M, Artur, Reina, Giovanni C, Thibaud, Yajun, Brigitte, Mykola, Yann
Wirebonding:
- No new Quad for week 1
- Status update on the SCC PCB order
- First impressions on the ITkPix flex: very uneven surface, proposed rugosity measurement, wirebond tests tbd
Gluing:
- Last test to be done before reporting: check the spatula / change spatula
- Prepare a summary presentation for the flex attach
- Clean the old jig (low priority)
- Schedule a presentation from Artur for the alignment helper
Metrology:
- MMT calibrated and operational again
- Thibaud is reviewing metrology scripts + adding tollerances
- We could start to develop the metrology of the ITkPix flex
Testing:
- Scripts being organised / backup on gitlab https://gitlab.cern.ch/lpnhe-itk
- Update from Artur about automatisation: we can talk to the power supply, started to look into MQTT as protocol to communicate between scripts and instruments
- Update from Fred on the DB: localDB running @ IJCLab cloud, some issues of connections for CEA but should be OK for us. Grafana up and running.
- Update from Yann about mechanical support: need to order the heatsink to complete the assembly
X-ray tube:
- Design files obtained from KEK. Yann confirms that we can duplicate the design. We started to look at the design and to understand it and to improve the design for our usage. To be verified the compatibility for our coldbox.
- Lydia will help Julien & Luc for the dossier
Management notes:
- Unformal TODO list here https://etherpad.in2p3.fr/p/LPNHEITkTODO
- We can explore Jira, Matthias proposed to do it at Paris Cluster level https://its.cern.ch/jira/projects/ITKPARISCLUSTER/summary
Improvements:
- Proposed by Brigitte: add a solder station + binocular in the new salle grise