Participants
- Présents:Adrian (AI), Vladik (VBa), Rémi (RC), Guillaume (GF), Roman (RP), Vincent (VBo), Stéphane (SC)
- Remote:Jean-Yves (JYH), Taikan (TS)
- Excusés: Jérôme (JN), Alice (AT), Julien (JB), Frédéric (FM)
Analysis
- Single SLAB @ LLR
Vladik & Adrian
- Effect of ambiant light and with flash light seen
- Set-up Config
- 2 slabs tested
- SLAB #15 (with cover)
- SLAB #20 (no cover)
- with and without black fabric
- thr @ 225
- Masking done "by hand"
- Run config
- Spill Length = 170ms
- Continuous Current
- 1/2h runs
- Note
- Config was first incorrect (TB instead of BT) → ILC mode (lim @ 5 ms)
- Results
- 2 distributions:
- Peak left of mips seen
- larger for uncovered one
- without black fabric
- rate = 0.05 Hz/cm2
- DQ
Adrian
- Data Corruption
- Type 7
- hit bits ≠ on low/high gains
- 6 / 10^4
- NHits>64 = 0
- List fo Histograms
- negative == adc=4
- Channels 44–47, ASIC 1 & 4
- SCA = 0 & >0
- Spill# ≥ 30000
- was only 2nd part of data
- check of hist plots
- Beam Test @ LAL
- Set-up Config
- Scan of Spill Length
- Run Config 1
- Spill Freq= 10 Hz
- SL = 5ms
- Results
- Large noise peak seen at BCID = 2050
- same in CC and PP mode
- Why in BT set-up and not LLR Slabs
- [ ] Test SLAB #15 in BT Set-up
AI
- [ ] Change BT Power Supply
AI
- [ ] Check FW version of SLAB #15
JN
- Run Config 2
- SF = 10 Hz
- SL = 2.5 ms
- Data Corruption = 0
- Run Config 3
- SF = 40 Hz
- SL = 2.5ms
- Data Corruption = ??
- Other checks
- SLABs readiness
- SLAB #21
- SLAB #?
- SLAB #13
- bulky capacitor
- doesn't fit in det
- On top of structure
- How to integrate it ?
- DAQ
AI
- FM will work at LAL Thrusrday & Friday
- To Do's
- Add monitoring of LV PS (V, I)
- Prepare place for data
- Add e-log for
- llsstagbench
- llrchipbench
- Install data export from pyrame → DQM
- Integration of ECAL table
- Installation
RP, GF
- Visit @ DESY
- RP, GF
- 16/05
- Contact with Ralf Diener
- Beware of magnet fields in BT24.1
- → no DESY table
- security distances
- check for amagnetic support
- Distances for set-up
- Support for single slab in PC magnet
- Table
- Mechanical test of ECAL table
GF
- Admin
VBo
- Docs
- Wiki
- Doodle link o be corrected
- Doodle
- to be completed
- RP will ask Korean colleagues
- TNA
- Started
- Asked for limitations of reimburshment
- DESY
- indico page open for regisration since last friday
- Tests of ASIC's
- Plans for Kyushu
TS
- Check the decouplings on the SK2a test-board
- Noise measurements
- Signal Stability
- Excell sheet with PS
-
Injections test @ LLR
VB
- Slides from Shriddha & Luc
- inejction @ ≠ delay
- Mainly OK
- Successful injection of 15 pulses
- Analysis
- To be discussed at next meeting
- Training session
- AoB
- Acronyms
- SF = Spill Frequency
- SL = Spill Length
- Thr = Threshold
- SCA = Shift Capacitor Array
- RC = Run Config
- BCID = Bunch Crossing ID [0-4095]
- CC = Continuous Current
- PP = Power Pulsed
Il y a un compte-rendu associé à cet événement.
Les afficher.