Presents: Yahya, David, Cyrille, Paul, Francesco, Yann, Giovanni, Thiziri
General news:
- PRR report arrived. Not passed (as expected). Issue with the yield. A task force will be formed.
- We could do a "local yield" to understand our
- ITk Week
Probe station:
- Liquid is back in the chiller
Metrology:
Gluing:
- We have 2 modules to glue
Wirebonding:
- PPP38 is @half done to wait for training, but could be finished since we have two new modules that will be added in the pipeline
- We received the red-chip assembly for testing
- We need to contact MB for the screw
- New tool has not been ordered because the company was not in our DB. The procedure to add into the DB is initiated.
- Yann contacted a couple of workshops to do the planarity rectification and we can't obtain a positive reply, the constraints are too tight
- no luck also with other labs
Testing:
- 10.3 - 10.4 was presented to the collaboration
- The design of the heatsink for the climate chambre is fixed. Order is ongoing. Stuck in the administration
- Tests for 10.2 ognoing
- Dewpoint logic is in the ATOM FW now, under test
- Magnet is to be integrated in the interlock
- HV card is under repair @ CAEN, probably done this week
Outer barrel wirebond protection:
- Glue height is not in spec and it's not stable
- Is this a problem? Diego (CERN) will do weight tests to asses this point
- New stencils received
- Conductivity might be solved by new stencil
Parylene masking/demasking:
- We received new tooling from Jon. We need to test it on PPP15 and PPP16
Xray:
- Yahya ask for black foam. We have it, we just have to find it
- A piece that can be adapted for humidity control has been found.
- No new bottle of nitrogen yet
- Plan to use the switch to control the peltier