Presents: Thiziri, Pascal, Stephanie, Julien, Giovanni, Paul, Bhuvan, Thibaud, David, Yahya, Cyrille, Francesco, Reina, Marc
General news:
- Visit from UChicago this friday, tour in the cleanroom at 9:30
- ITk production during the summer: very low number of modules foreseen (10-15 in the cluster for june/july)
- Claudia Gemme is visiting this week
Probe station:
- Cooling liquid is in france but must be freed from the customs. We need to understand how to do it.
Wirebonding:
- Sparse issues
- PPP50
- GA2 detached
- After a series of issue new parameters have been found
- GA1 wirebonded
- GA3 some zone didn't held. Maybe less solder surface or detached under it
- We are with 2 screws left. The old screws have been sent to MB for exchange
- PPP52 to be fixed for HV
Metrology / Masking:
- Parylene masked modules pictures re-taken.
- We need to ask visual inspection
- PPP36
- Unmasking was OK
- Sensor was broken (early breakdown). Hardly related to masking/unmasking
- PPP6
- Mask is easier with the syringe
- [Mechanics] Parylene tools holder must be reworked a bit to be used. A second plate is going to be produced.
- Flex metrology to be done
- PDB to be checked
- Received the caps + carrier covers special for parylene
- Low priority: do a new masking for the vacuum plate
Assembly:
- The three Leonardo modules left we'll use for a simulation of a production test
- Gluing tool 16 sent back
- New tool to open and check
Outer barrel protection:
- Three gluing test with canopy-glass
- Test 1 and 3 good
- Test 2 not good on one pillar
- Tested several hypothesis but didn't find an explanation
Testing:
- PPP36 completed INITIAL_COLD. In principle it wasn't possible to not have it completed.
- Busy with core column issue. PPP40 under test. Promising results
- PPP41 had a bizarre behaviour but second test is done
- In contact with CAEN to look to the floating common
Xray:
- Plate to hold the cards in the xray is done.
- A lot of tests to be done to find the proper nitrogen/dry-air/chiller temperature setup
Various:
- Single Chip Cards received. We need to inventory them.
- We need to progress with the boxes to hold SCC modules for TB operations
Il y a un compte-rendu associé à cet événement.
Les afficher.