Present: Thiziri, Paul, Bhuvan, David, Karim, Cyrille, Francesco, Thibaud, Stephanie, Pascal, Reina
General news:
- new version of module-qc-tools
- Task force on the Core column? Not clear the formality of this effort, we will start (.. continue) to investigate
- Inventory 29/04-03/05
Parylene
- Module 6: tab broken. Contnue with masking? We decided to try
- 7 masked + PPP6
- PPP40 is done but useful for core column
- PPP41 done but tests to be checked
- PPP42 to be tested, candidate for further parylene
- Foam pillars for the module cover are arriving this week
Wirebonding:
- PPP50 needed to re-place most of the wires, ready to be bonded
- PPP38 and PPP39 in the pipeline
- Oxided ultrasonic screws -> needed to change parameters to much higher. We have ~50 screws like that
- We found 2 screws from another lot that are good
Testing:
- PPP40 completely tested
- PPP41 completed INITIAL/WARM without errors (software/measurement); 3x FE with normal results but 1x FE with strange (bad) results. To be checked with experts
- PPP42 is ready to be tested
- PPP37 is wirebonded, DB data is to be checked. Missing photo (?)
- We need to proceed for the SQ slides
- We need to investigate the grounding loop on the CAEN
Outer barrel wirebond protection
- 3 glass tests done. Measuring glue thickness.
- Vacuum issue: a lot of leakage
- Step 0 done
- Step 1 (glass) ongoing for the SQ
Metrology:
- Bare Module
- Review state of the measurements and upload to PDB
- The IVs have been done but not uploaded
- Flex
- Assembled module
- Carrier to be added to PPP50
Gluing: