Presents: Paul, Thibaud, Pascal, Karim, Francesco
News general:
- PRR
- ITk Week next week: Paul is going to do the cluster summary
Material:
- 10 NCAB flex will be distributed durng the ITk Week, we will get 4 for our Leonardo modules
Wirebonding:
- Mod 42 bonded: 4 wire not stick GA4 150,151,152,155; accident during pull-test on GA3 test wires destroyed without recording pull force
- Darkened pad posed no issue for the WB, the bad pads were clean; no idea about why it didn't work
- Mod 37 is the next good
- There is a module from IJCLab
- Tue 20th a commercial rep for the camera will come to show the product
- Equerre is OK so we can proceed with finial program finition
Metrology
- Review of the programs should be performed with the information obtained during the specialized training
- Paul finalized the documentation
- Training shifts this week starting today
- Take the time to enter all information in the PDB during data taking
- Canopy metrology ongoing
- Program optimized to 23 min
- Backside flatness damaged but probably still acceptable 30 um on an object 10 um planarity
Gluing
- New tools need to be commissioned we have glass and dummies but no flexes
- GLuing of Leonardo modules will start after the ITk Week
Testing
- Mod 40, 41 and 42 to be tested with the full procedure
- The pair doing the tests must have access to the PDB and LocalDB to proceed
- New Yarr cards received, Francesco will move the test setup from the 640 MBps long cables to 1280 MBps short cables
- DCS board
- NTC measurements are stable: 3 Hz
- Pression: 6 Hz
- Dependence on the MQTT messages from the Climate chamber
- 8-module structure has been reinforced with the extra blocks on the back + one in the middle
- 6x new heatsink received
- We need to cut 8x metal rectangles to block the vacuum on the non-used chucks
Xray
- Cooling system is OK and we can reach -45 C on an LV off module
- We need dry air now
- Radioprotection is OK for Francesco, Paul and Yahya
Il y a un compte-rendu associé à cet événement.
Les afficher.