General news:
- PRR in March 7 and 12/3
- Our modules we'll be used for complementary analysis (no OBWBP installed so not useful for delaminations studies at this stage)
- Possible start of the production: end of spring (?)
Training for production:
- Cyril will arrive the 1st of april, we should organise
- Thibaud will arrive the 1st of March
- Oleksandra should arrive mid-may to mid-july
- Bouvan should arrive asap (visa issue) until mid-june
- We need a planning for training and the (few) actual activities
Wirebonding:
- Joystick issue is understood, for now we'll leave the object as-is, the operator can use the machine even with the issue present
- Equerre in queue for fabrication in the lab workshop
Metrology:
- Formation on the CHR scanner tomorrow morning, Francesco
- We need to redo the metrology on the 4 modules + put everything in the PDB
- IV to be done, since we don't have the liquid for the chiller of the Tesla200 we'll need to use the old probestation
Assembly:
- 2 new gluing tools received in IJCLab, to be recovered
- New flatness tool received, we need to try it
- OBWBP see thiziri talk
Testing:
- DCS / Interlock is finalized we need to do the tests
- Small bugs in the fw corrected
- 4-module setup connected on the power side
- Buchons arrived, to be understood
- Mousse for self-production of buchons arrived too
- Yann is studying a solutiont o avoid the deformation of the structure
- Heatsink base is on the pipeline for our workshop
- No news about the climate-chamber chuck
Xray:
- Need to modify the software to impose 30 kV
- Structure is to be designed
- Software is to be developed to merge the incremental scans
- We need to install lpnlp41 on the xray setup