1. Reception tests (for module cells, bare local supports, PP0s, pigtails...)
2. Pigtail installation
3. Cell integration (TIM deposition, cell installation, PP0 installation, connections)
4. QC testing of loaded local supports (electrical and non-electrical QC tests)
5. Database and logistics (including transport)