Presents: Marco B, David Thibaud, Pascal, Luc, Frederic, Marc, Paul, Eric, Francesco C

General: qualification advancing

Wirebonding:

  • out of the 4 digital modules received one is not bondable
  • one module under wirebonding:
    • GA1 gluing not good, but wire-by-wire possible
    • GA2/GA3 OK
    • GA4 not going well, many broken wires

Assembly & metrology:

  • Visual inspection & metrology for bare flex 2.4 and 3.2 done and qualification data submitted
  • Dummy silicon ongoing
  • Gluing (glass) starting tomorrow wed 12 with Marco B

Testing:

  • Advanced tests on data transmission ongoing, testbench at 1.2 gbps working
  • LV main board in the hands of Julien but he's in vacation, next week he will resume
  • LV secondary board
    • simple version full designed
    • to be verified that interlock pins can be driven directly from a microcontroller
  • DCS card (Karim) progressed
    • Lecture humidity done with a 555 not of the good level, but good component ordered (will arrive mid may)
    • All inputs tested
    • Frequency ~0.4 Hz
  • Material for multi module structure re-ordered at level precommande. The order has to go through the usual approving process. Material en stock.

X-Ray:

  • Led for power-on to be ordered
  • Electric cabinet arrived, to be assembled, Yann will start today

Database;

  • User names must be re-created on the localDB
    • To complete the PDB connection the two passwords are need (not possible to use the SSO like for the web interface)
  • Qualification questionnaire
    • Fred is completing it
    • He is missing some info, we will follow by email
Il y a un compte-rendu associé à cet événement. Les afficher.
    • 1
      General news
      Orateurs: Francesco Crescioli (LPNHE), Giovanni Calderini (LPNHE Paris), Reina Camacho Toro (LPNHE)
    • 2
      Wire bonding
      Orateurs: Lina Zaraoui (LPNHE), pascal corona (LPNHE)
    • 3
      Mechanics
      Orateur: Yann Orain
    • 4
      Sensors & Module Assembly
      Orateurs: Artur Cordeiro Oudot Choi (lpnhe), Giovanni Marchiori (APC Paris), Marco Bomben (APC), Paul Chabrillat (LPNHE-CNRS)
    • 5
      DAQ & Electronics
      Orateurs: David MARTIN (LPNHE), David MARTIN (LPNHE), Francesco Crescioli (LPNHE), Paul Chabrillat (LPNHE-CNRS)

      Carte "Power Distribution" et toron de 8 paires en cours de câblage mais Julien est en congés une semaine. La carte intermédiaire est dessinée, placée et routée. Il faut s'assurer que l'on peut piloter l'interlock avec (en courant) avant de la lancer la fabrication.

      Le système de monitoring (température, pression, humidité) est fonctionnel. Les tests sont réalisés avec des composants et en volant. Il faut maintenant rendre ce système plus ergonomique (=> carte à trou ?). La vitesse du monitoring global est-elle importante ?