Meeting ITk LPNHE

Europe/Paris
Higgs 12-22-2-28

Higgs 12-22-2-28

Francesco Crescioli (LPNHE), Giovanni Calderini (LPNHE Paris), Reina Camacho Toro (LPNHE)
Description

Join Zoom Meeting
https://cern.zoom.us/j/94940524377?pwd=dnI4NnZUWGNMN1ZpRFJncFU1ZlMrQT09

 

Present: Pascal, Julien, Marc, Paul, Yann, Luc, Giovanni C, Giovanni M

General news:

  • Atlas upgrade week upcoming
  • Testbeam 2 novembre 

Wirebonding:

  • Clean room still not available. Estimated delay ????
  • Wire order not received by MB. Investigating.

Assembly

  • Pump order, no news
  • Metrology pump to be installed. We have a doubt about the oil discharge of the pump, to be checked if compatible with usage in plafond soufflant

Testing

  • Started to design the connection between the PS/DAQ and the multi-module setup inside the climate chamber (David Martin + Eric Pierre)

X-Ray box

  • Livraison sem 43 (24/10): no news, good news?
  • Lead not arrived yet
  • Coldbox assemblage is urgent

Testbeam:

  • Artur is already analysing the data. He will present to a meeting soon.

Irradiation:

  • Yann designed a new plate for the IRRAD holder designed by Philippe/Marco long ago, it is going to be produced @ CERN and tested by Giovanni this week
Il y a un compte-rendu associé à cet événement. Les afficher.
    • 1
      General news
    • 2
      Wire bonding
      Orateurs: Brigitte DELAMOUR ({CNRS}UMR7585), pascal corona (LPNHE)
    • 3
      Mechanics
      Orateur: Yann Orain
    • 4
      Sensors & Module Assembly
      Orateurs: Artur Cordeiro Oudot Choi (lpnhe), Giovanni Marchiori (APC Paris), Marco Bomben (APC)
    • 5
      DAQ & Electronics