- Tests CE65-v1
- on the lab: Andrei+Kimmo will work on leakage current measurement in August
- Yitao (from previous discussion): finalizing clustering with analogue output
- TID: reminder than 100 Mrad CE65-v1 was measured at CERN
- it was estimated that the performance was not good enough for testbeam
- additional tests needed in Strasbourg
- neutron fluence: APTS is getting results on 10^13 (10^14 not tested) and 10^15
- APTS also trying 2.10^15 and 5.10^15
- on our side, we could try 10^13 and 10^14 => but timeline should be discussed
- still some work to be done on variants C and D
- Andrei can work on that with Kimmo later
- RTS investigation ???
- Szymon volonteers if we can stop the DAQ on one pixel
- MOSS design (from discussion with Fred)
- job by Fred is done
- Xiaochao still working on some verification but if no pb then no impact on design
- submission when ready (best guess is September)
- MOST design, Szymon
- switch to new pixel design and assembly on-going
- avoiding Psub bias but trying to increase collection node voltage (still DC)
- digital part still to be updated with custom cells
- cleaning DRCs
- Szymon building models with Liberate for simpler digital simulations
- CE65-v2 design, Andrei
- Isabelle is doing extraction of parasitics to check influence
- so far no issue, but still on-going
- trial to apply custom rules (due to stitching and modified diodes) from CERN
- some violations but probably not harmful
- need some checking with Szymon
- Need to prepare a datasheet-like document
==> Next meeting: Wednesday 24 August
Il y a un compte-rendu associé à cet événement.
Les afficher.