  • Tests
    • about new irradiations: Serhyi will investigate with Hartmut, not sure we have CE-65 there
    • Yiato status:
      • partly resume work (from home!) on Beam test analysis
      • now work on telescope alignment
      • Goals from Auguste: find out the detection efficiency (which relies only on seed signal)
        even with the crude CE65 analysis (absolute cut on pixel value)
      • leave the detailed handling of analogue signal

 

  • MOSS design, Fred, Xiaochao
    • feedback from foundry about mock-submission => import design rules underlined
    • request about DAC: modification of layout, need to assess amount of work (Hung)
    • currently verification on-going at CERN
    • PE finished, Xiaochao moving to time model of the pixel digital output and PE
    • Jean starts using Voltus to estimate power dissipation on PE
    • submission still planned for April

 

  • Comments on Cliosoft-SOS use for MOSS-MOST, Fred
    • discussion with Patrick Pangaud to understand some tech details
    • one local PC will be dedicated to that, need some virtual machine setup with IPHC-IT service
      • contribution from C4Pi: 2kEUR
    • a SOS server will be set-up at IPHC with support from IT-service

 

  • CE-65++, Andrei
    • same status
      • wait for results on current CE-65
      • doing simulation on the DAQboard read-out chain to understand issues observed
      • Clear interplay between resistances on boards, capacitances and phase-shift setup
        • also reducing frequency should make things much more stable
        • on top of under/over-shoot, pb of oscillation (that can be cured by changing resistances)
      • Current conclusion
        • carrier board should be OK from simulations
        • proxy board is really the issue
        • behaviour with frequency different in tests (effect visible) and simulations (effect no visible)
      • TO DO
        • Kimmo investigating the 10 MHz mode
        • Andrei is continuing simulation
        • need systematic measurements with changing phase-shift (Szymon, Serhyi ?)
        • organize long discussion with experts!!
    • nothing special from mock-up submission feedback
    • wondering about pads: new metal stacks to be included, but CERN should take care of this
      • so waiting if CERN will really move there on not
      • not-clear what to do with top-layer

 

  • NEXT MEETING, Thursday 3rd February, 10h30
Il y a un compte-rendu associé à cet événement. Les afficher.
    • 10:30 10:50
      Test discussion 20m
      Orateurs: Andrei Dorokhov (IPHC), Dr Serhiy Senyukov (Institut Pluridisciplinaire Hubert CURIEN (IPHC)), Szymon Bugiel (IPHC), Yitao WU (USTC & IPHC)
    • 10:50 11:10
      MOSS design 20m
      Orateurs: Frédéric MOREL (IPHC), XIAOCHAO FANG
    • 11:10 11:30
      MOST design 20m
      Orateur: Szymon Bugiel (IPHC)
    • 11:30 11:50
      CE-65++ 20m