- Test discussion, Yitao
- report from test beam at DESY: A4, B4, C4, D4 got data
- 2 triggering modes: scintillator or small DPTS
- note that DPTS is smaller than CE65 => mostly DC-amp covered by trigger
- event monitor developed in EUDAQ -> allows alignment check
- CE-65 values crudely selected
- alignment between ALPIDE & CE65 observed
- noise analysis with TAF, some difference with or without beam
- first look at hits from TAF (no correlation with tracks)
- Note that the DAQboard used in beam is different from lab
- next steps
- continue a bit the analysis on clusters only with TAF
- develop analysis with corrycreckan for correlation with tracks
- Additional lab test before Christmas
- AC-Amp need more systematic data
- Suggestion by Andrei to scan the phase shift => need help from Cagliari here
- MOSS design, Fred, Xiaochao
- mock-submission soon to be sent (without the new metal layers)
- new PDK with 2 metal layers => potentially small impact on our part
- CE-65++ design, Andrei
- first chip on its way with one pixel type
- may not be fully complete but still good for mock-submission
- next year the design of other variants should be easier
- about 3.3 V digital IO? let's switch to the CERN way whenever defined
Il y a un compte-rendu associé à cet événement.
Les afficher.