65 nm meeting
Bat 20 - uElec
https://cern.zoom.us/j/69600555186?pwd=eVcxUTBnc2J0bWwyQ3RBM0ttZkN6Zz09
* CE-65 Test, Szymon, Yitao, Serhyi
- current test beam is mostly used to get the CE-65 system running
o there is not yet a good connexion with the telescope-trigger
o Szymon does not understand very well the small amount of data taken
- Sergey will bring back one DAQboard from CERN at the end of this week
o lab test will start (hopefully) from November 2nd
o for data analysis, we still need to connect rawdata format of lab sw to someting, probably TAF (Jerome)
! Szymon has to switch to design, test team will be essentially Serghyi, Yitao (Jerome)
- target beam at DESY from 29 Nov. to 6 Dec.
o we skip SPS beam 10-15 Nov.
=> Jerome writes a mail to Miko to crosscheck this is reasonnable
- Some discussion on the plots posted on Mattermost (https://mattermost.web.cern.ch/iphc/channels/ce65-beam-test)
o backbias -3 V
o AC high-Voltage 4 V
o conversion factor measured with external voltage O.O5 mV/ADCU
o no clear conclusion
- Plan the message for next WP1.2 on Wednesday 3rd
o prepare 1-2 pages with plots for the DAC (nothing on irradiated chips)
o prepare 1 page with a positive message about CE-65 but no results (except for the scope image)
=> Andrei
- STRONG comment by Andrei: we need to assess at least one version of CE-65 works before designing CE-65++
* MOSS, Fred
- still working on the vertical PE
- debugging the digital flow with Pedro (@CERN)
- seems that the 6 metal layers will be available but no new kit availble...
o note that 5th layer reserved for power
- mock GDS file to be ready by end of November 2021
o only realistic if metal layers do not change...
o expect long feedback about stitching with Tower
- two options for the pixel (18 and 23 um) still to be chosen
o front-ent from DPTS (CERN in charge)
* CE-65++, Andrei
- design is starting again
- pad ring with new features (power supplies) already there
- we need to re-discuss the various options for next meeting (below a few hints already)
o need to include the 2 pitches from MOSS
o we can keep same pitch
- we don't know yet if the process will be modified (doping profile, ...)
o we can submit same sensors as CE-65 in that case
==> next meeting Wednesday Nov. 10th at 10h30