Meeting ITk LPNHE

Europe/Paris
Description

Vidyo conf https://vidyoportal.cern.ch/join/bvavdWAAVCg1

- mainteinance of the wirebonding machine ongoing. No errors were detected during maintenace, no problem was apparently found and solved except the rigidity of an ethernet cable of the camera.

- we asked for firmware&software updates + scheduled mainteinance and then ship back the machine after few days of testing

- the machine is going back at its place, but in case it is still malfunctioning we will try with an UPS or a change of location

- we must prepare material to test the wb machine before it comes back (~ 2 weeks from now):

 * SCC PCB

 * Glue a couple of red chips on bad PCBs and a yellow chip on a good PCB

 

- Quad wirebonding map in progress, no news from CEA tests

 

- Metrology of our gluing tool: it's not usable to stay within 15 um of flatness, the tool is badly deformed (~100 um depression in the middle)

 

- Vacuum for metrology:

 * triphase for the pump to be installed soon

 * tubes&material to route the vacuum near the metrology machine ordered, it will arrive in ~10 days

Il y a un compte-rendu associé à cet événement. Les afficher.
    • 1
      General news
    • 2
      Sensors & Module Assembly
      Orateur: Marco Bomben (LPNHE)
    • 3
      Mechanics
      Orateur: Yann Orain (LPNHE)
    • 4
      Wire bonding
      Orateurs: Brigitte DELAMOUR ({CNRS}UMR7585), pascal corona (LPNHE)
    • 5
      DAQ & Electronics