DESY2018-06 prep meeting #0
→
Europe/Paris
https://vidyoportal.cern.ch/join/IGqhOM6Arg (Vidyo)
https://vidyoportal.cern.ch/join/IGqhOM6Arg
Vidyo
Please join the meeting by clicking this link: https://vidyoportal.cern.ch/join/IGqhOM6Arg
If you want to join by phone, please use one of the phone numbers listed in the link below:
http://information-technology.web.cern.ch/services/fe/howto/users-join-vidyo-meeting-phone
and enter the meeting extension 1010377183 in order to join.
Thank you for using the CERN Vidyo service!
Dates
- Monday, June 24th – Sunday, July 7th
- See http://particle-physics.desy.de/sites/site_particle-physics/content/e252106/e261123/infoboxContent297791/Testbeam_schedule2019v5_ger.pdf
- Possibility to use the EUDET telescope
DAQ
- use of Telescope ?
- EUDET+TLU ?
LAL-status
- ASU's
- FEV-BGA
- 1 FEV11
- 2 FEV12
- FEV-COB
- 1 equipped
- 2 to be bounded @ CERN in April
- Cosmics seen
- Pedestal behaviour
- Wafers ?
- 1 on each to start with = 4 wafers
- FEV-BGA
- SL board's
- Kapton + PCB
- USB readout
- FW: prog on going
- SK2
- Config on 8 SK2 next week
- RO and control
- LabWindow
- C language
- integration with PYRAME ?
- Core Module: later..
- SK2
- Clock through CORE module
- To be tested
- works on other experiments (C3 ATLAS)
- Mechanical set-up
- for 7 ASU's
- To be started soon
- Can it be adapted to hold FEV13's boards ? (see Taikan's presentation)
- Note: tere is one board in LLR for measurements
- SMBv4
- GradConn connector to replace spring contact on test bench
- Better contacts
- GradConn connector to replace spring contact on test bench
- Gluing in LPNHE
- when ?
- 4 Layers
- LAL
- 2 wafers 550μm
- LPNHE + LLR
- 2+2 against TLU ?
- 10 needed for full 4 boards
- Can be completed after tests
- At least in Kyushu
- Can be completed after tests
- LAL
- Physics program
- low E (puch through)
- high E (W)
- Milestones
- A list of milestones should be made to check critical delays
FEV13-Jp (Kyushu plans)
- MEXT Status
- Broadcast not so good
- no announcement of hosting
- interest of Jp gvt → start disc. with other gvt's
- Return from France
- IN2P3 & Gvt positive; CEA negative
- but Physicist (first) disapointed
- Broadcast not so good
- FEV13-Jp setup
- Carbon frame in prep.
- diameter ≠ (3mm instead of 4mm)
- TLU test started
- Support structure
- Horizontal not OK for vert.
- 5 Slabs
- 1 @ LLR
- 4 @ Kyushu
- Transport
- Box from LLR ?
- New ones ?
- DAQ
- TLU
- Carbon frame in prep.
- Physics program
- S/N ratio ~ OK
- Scan of individual thr.
- TDC
- 500 μm
- Test of small sensors
- PSD & APD
- Prelim results
- DAQ ?
- Testboard
- no telescope
- Position from Multiple layers
- PSD & APD
- FEV13 results
- S/N ratio ~ 45
- 1 working slab @ CERN
LLR
- Stack needed ?
- Readout
- HV
- Not setup for test
- Support for installation / debugging
- Mechanical Set-up ?
- Common box ?
- ≥ 1 month
- Common box ?
Organisation
- Who
- LAL
- LLR
- VB for ≤~1 week.
- PhD student ?
- Kyushu
- opt 1
- 2nd week
- opt 2
- 2 weeks + 1 week in LLR (17–23/06)
- opt 1
- Roles
- Logistics
- DAQ
- EUDAQ + TLU
For next meeting
- Discussion around CALICE meeting
- Review ~ 1 week after
Il y a un compte-rendu associé à cet événement.
Les afficher.