WP1 NEXUS Kick-off meeting
→
Europe/Paris
Key Outcomes
WP1 established task coordinators across partner institutions, clarified secondment agreement procedures requiring director signatures prior to travel, and identified need for better visit coordination framework to manage underground lab capacity constraints. September meeting scheduled to review first completed secondments as implementation model.
Decisions Made
- Task coordinators assigned: Matthias Laubenstein (Tasks 1.1, 1.3 at Gran Sasso), Aldo (Task 1.2 at Gran Sasso), Raymond as point contact for all three tasks at SNOLAB until work plan finalized, Paul for Boulby, Sara and Luca for CNRS, Robbie for both Tasks 1.1 and 1.2 at UWC
- Meeting frequency: WP1 will follow WP4's quarterly schedule, with next meeting in September to review Sara and Luca's Australia secondment as first implementation case
- Radon monitoring activities from WP2 to be moved to WP1, pending detailed proposal from Aldo and Nicola
- Radio-purity database: SNOLAB will explore providing docker image to mirror radiopurity.org instance on CNRS server in Lyon, potentially combined with student secondment to France for installation and Modane visit
Pending Confirmation
- Mailing list verification: All partners to confirm their country/institution members are included in WP1 distribution list
- Box folder structure: Silvia to check with Fairouz whether centralized Nexus folder structure exists before creating separate WP1 shared space
Visit Coordination Framework
- Challenge identified: Small underground labs with limited capacity (e.g., 15-person underground limit) require advance notice for visit planning; short-notice requests create operational difficulties
- Communication gap: Labs providing available dates but not receiving confirmation creates scheduling uncertainty and blocks other potential uses of locked dates
- Robbie's plan: Will finalize Gran Sasso visit (September timeframe), then contact LSM about potential France visit during same trip
Secondment Administration
- Required documentation: Consortium agreement requires signed secondment agreement form for each secondment, with signatures from traveler, hosting institution director, and sending institution director prior to travel
- Timing: Forms must be completed "some time in advance" (not one year, not last-minute), with CV and ID provided to receiving institution
Planned Activities
- Sara and Luca Australia secondment: Approximately one week visit to SAPL to discuss and potentially measure radon concentration, consult on germanium measurements and radiopurity database integration for existing SAPL data 26
- SNOLAB germanium calibration: Cross-calibration plan in development using new IAEA samples; schedule not yet determined
- Round table discussions: Proposed for Tasks 1.1, 1.2, 1.3 to coordinate radon monitoring networks and share approaches across institutions; requires identifying available participants at each lab
- Radon network coordination: Multiple institutions developing radon monitoring networks independently; round tables could align efforts and leverage existing initiatives like radiopurity.org database
Action Items
- All partners: Verify WP1 mailing list includes all relevant personnel from their institutions/countries
- Aldo and Nicola: Send detailed proposal for WP2 radon monitoring activities to be moved to WP1
- Raymond: Discuss with Steve Sekula about SNOLAB resources for radiopurity.org docker image and potential student secondment to France
- Silvia: Draft flexible germanium measurement protocol allowing all labs to participate, accommodating different calibration approaches
- Silvia: Add May 19 meeting to Nexus Indico with minutes
- Silvia: Check with Fairouz about centralized Box folder structure before creating WP1 shared space
- Silvia: Send July communication to schedule September WP1 meeting
Resources Shared
- Nexus Indico: Main coordination platform at indico level; WP2, WP4, and management board currently using
- Box shared drive: "Nexus work package form" folder on CNRS server contains secondment spreadsheet and will house common bibliography and work plans