DIRAC Project meeting
→
Europe/Paris
Description
Indico
Etherpad
Zoom
Vanessa HAMAR vous invite à une réunion Zoom programmée.
Sujet: DIRAC@IN2P3
Heure: 25 févr. 2026 02:00 PM Paris
Participer à la réunion Zoom
https://cnrs.zoom.us/j/93869704565?pwd=od11aodF9MrbByKcduakyMXZ7DeLbq.1
ID de réunion: 938 6970 4565
Code secret: M0hgg2
---
Une seule pression sur l’appareil mobile
+33170372246,,93869704565#,,,,*122802# France
+33170379729,,93869704565#,,,,*122802# France
---
Participez à l’aide d’un protocole SIP
• 93869704565@zoomcrc.com
Code secret: 122802
Instructions pour participer
https://cnrs.zoom.us/meetings/93869704565/invitations?signature=TG6iDcQoJw9IEJCXQ0umHpYX3ozvfY1Grly1LmyM2ik
Sujet: DIRAC@IN2P3
Heure: 25 févr. 2026 02:00 PM Paris
Participer à la réunion Zoom
https://cnrs.zoom.us/j/93869704565?pwd=od11aodF9MrbByKcduakyMXZ7DeLbq.1
ID de réunion: 938 6970 4565
Code secret: M0hgg2
---
Une seule pression sur l’appareil mobile
+33170372246,,93869704565#,,,,*122802# France
+33170379729,,93869704565#,,,,*122802# France
---
Participez à l’aide d’un protocole SIP
• 93869704565@zoomcrc.com
Code secret: 122802
Instructions pour participer
https://cnrs.zoom.us/meetings/93869704565/invitations?signature=TG6iDcQoJw9IEJCXQ0umHpYX3ozvfY1Grly1LmyM2ik
Compte rendu réunion DIRAC@IN2P3
Mardi 31 mars 2026
Atendees: Andrei, Axel, Bertrand, Héloïse, Loris, Luisa, Mazen, Natthan, Stella-Maria, Sorina, Vanessa
Agenda:
- Project Status
- Projects
- DiracX
- Publications / Conferences
- Consortium news
- AOB
1. Project Status
Partial budget received (75%)
- Missions (DUW'26, Prague)
- DUW organization (cattering, etc)
- Try to avoid participation fees
1.1 Versions :
- DIRAC v8.0.78
- No changes
- DIRAC v9.1.3 (from 9.0.20)
- Database schema updates
- RSS optimization
- Other minor changes
- DIRACX Release v0.0.11 (from 0.0.9)
- Minor (authdb, sandbox optimization)
1.2 DiracX Hackathon (24-25 March)
Less participation than usual, dominated by French participants :)
Main news
- First introduction of the diracx tasks
- Main stumbling block on the way of DIRAC->diracx migration
- Replacement for
- Agents, Executors, RMS
- Database+Logic+Tasks+Routers+Testing
- Well documented
- Can be exercised locally
- pixi environment
- Very useful for everybody interested in the diracx migration development - you are welcome to follow it
- CWL based WMS is advancing (Alexandre, Ryan, Natthan, Luisa, ...)
- Close to be released ?...
- Web interface updates
- Some change in the choice of the underlying libraries
- Next DIRAC Hackathon
- Date to be fixed - preliminarily end of June
1.3 Current Developments :
- The last Ddev meeting https://indico.cern.ch/event/1668571/
- Sprints (Natthan, Luisa, Stella, Loris, Heloise, Mazen)
- Heloise, Loris: Sprint related to the RSS
- IN2P3 contributions
- DMS/File Catalog porting (Andrei, Heloise, Bertrand ? )
- Goal: come up with the single configuration, best performing based on the acquired experience
- To be used in DIRAC9
- To be used as the starting point for the diracx migration
- Testing 3 FileCatalog DB schemas
- Currently used by default (split tables, DirectoryLevelTree)
- "Consolidated" (merged tables, DirectoryLevelTree)
- "LHCb" (merged tables, DirectoryClosure)
- Metadata support to be confirmed, updates might be needed
- 3 File Catalog services are set up per DB schema
- Performance Tests :
- Population
- using client server communication
- same script for all the schemas
- filling in about 1M files/100K directories with metadata
- ~4hours
- Queries
- Simple look-ups in parallel
- Various bulk queries - to be defined
- Status
- Services and databases are defined:
- Might need some optimization
- Population scripts are ready
- Adding about 70files/sec in a single thread
- Some minor improvements might be need
- Population test can be done this week
- Query tests can start afterwards
- Procedure to migrate current catalogs to be defined
- Better data consistency (Foreign Keys, less tables)
- Optimizations based on the LHCb and other's experience
- Directory usage
- Some plug-ins can still be there
- E.g. Multi-VO metadata
- diracx-cwl (Luisa, Natthan, Loris, Stella)
- How to accelerate the diracx WMS full-fledged system ?
- Status
- Deployment with K8s (Bertrand)
- Status
- Opensearch
- Common prefix a tous les indexes
- Utilisation des certificats
- Utilisation des certificats
- Still way to be found for the case with multiple databases
- DataStream - how to use ? To be solved hopefully
- Replacement of MinIO:
- SEA
- RustFS (?)
1.4. EGI Services:
- The service itself is running smoothly
- NTR
- Service splitting (Vanessa)
- Hosts are ready with DIRAC8 software installed
- DIRAC@IN2P3 service
- Operational (DIRAC8)
- KM3NeT configuration done
- Sites
- Site local configuration to be updated - a GGUS campaign to be done (Mazen, Luc ?)
- SEs - to be confirmed
- Jobs with Check-In tokens are running
- IAM token configuration to be done
- Needs help of the IAM managers to set up DIRAC clients
- DIRAC4EGI service
- Servers are in place
- Have to plan migration
- DIRAC9/diracx ?
- FITS DIRAC service
- ...
1.4. European/National Projects :
- GreenDIGIT (Mazen)
- Site Ranking criteria is defined
- GreenScore
- Taking into account also the Site congestion
- Monitoring criteria are defined
- Useful work per unit of gCO2
- Working on Simulation
- Using traces of real jobs (since 2023)
- Mimicking real scheduling algorithms
- Other resources to be included in consideration (HPC)
- PEPR STEEL (Andrei)
- Intermediate report submitted
- Still low profile contribution
- SpectrumCoP-WP[1,2,3] (Andrei, Vanessa)
- Final report in preparation
- ENSURE TECH-01 call (Sorina):
- Status
- MesoClouds RI proposal
- NTR
2. Projects
2.1 CTAO (Luisa, Natthan)
- NTR
2.2 Biomed (Sorina, Axel)
- Status
- NTRf
2.3. Juno (Andrei)
- Status
- Running production with real data
- Some File Catalog fixes are necessary
- File corruption due to overly long filenames
- Need schema update :(
- Fixes to be done are defined
- Waiting for the database backup and a window for a short service shutdown
2.4 KM3NeT.org (Vanessa)
- Status
4. Conference, workshop, publications
- CHEP'26, Bangkok, 25-29 May
- 2 DIRAC related contributions
- ISGC, Taipei, 15-20 March
5. Consortium
- Advancing with the HSF affiliation program
- Hope to conclude in few weeks
6. AOB
- The next meeting date: 28.04.26 at 14pm
- JCAD'26, Nantes, 5-7 October, deadline 22 May
Il y a un compte-rendu associé à cet événement.
Les afficher.