Presents: Thibaud, Yahya, Thiziri, Reina, Francesco, Stephanie, Yann
General news:
- 1st stage PRR
- 2nd stage in October: more sites qualified, better yield
Probe station:
- Mainteinance the 20/8
- Liquid to be refilled
- 2 IVs to be done
- Is the Agilent working again?
Wirebonding:
- Wirebonding chuck design not total clear, not possible to use it straightforward
- Rectification of the surface: we don't have the equipment to go down the current 100 um
- Ask our wirebonders to invite Saclay people to wirebond one module
- Joystick repaired (?)
Metrology:
- Vacuum pump mainteinance to be done
Parylene masking:
- Waiting for tools from Liam
- We could do the masking of the new modules
Testing:
- Support for vacuum chuck new design is good
- Production order is ongoing, but admin is not there these weeks
- SQ to be done
Outer barrel wirebond protection:
- Thiziri is @ CERN to test the glue thickness with glue on the test PCBs
- It has been confirmed that the results are due to the specific tool used and not procedure/operator dependant
- Resistivity: the hypothesis is that the stencil is not well aligned with the current flex pad location
Xray:
- we emptied the nitrogen bottle
- large box is too large
-