Presents: Oleksandra, Cyrille, Thibaud, Paul, Francesco, Bhuvan, Stephanie, Pascal, David, Yayha
General news:
- Better communication is needed. Etherpad exepriment failed.
- Product tracing must be done via localdb/pdb
- We need something for internal
Probe station:
- V2 modules IV done at 25 C. No issues.
- Cooling liquid?
Wirebonding:
- Wedge head back in place
- PPP49 is under bonding. GA2 is giving issue for height difference on the flex.
- Camera calibration?
Metrology:
- 1 BM done, 1 to be measured today
- Finish flex metrology this afternoon
Assembly:
- Glue two modules this afteroon
-
Testing:
- Parylened modules 29 and 30 are under test but a lot of uses
- Block 10 SQ
Xray:
- V1.5.1 is not good for xray, crashes
- devel is better, but not yet good
- Box is to be done
Il y a un compte-rendu associé à cet événement.
Les afficher.