Meeting ITk LPNHE
→
Europe/Paris
Higgs 12-22-2-28
Higgs 12-22-2-28
, ,
Description
Join Zoom Meeting
https://cern.zoom.us/j/94940524377?pwd=dnI4NnZUWGNMN1ZpRFJncFU1ZlMrQT09
Presents: Karim, Paul, Pascal, Matteo, Piero, Stephanie, Marco B, Eric, Francesco, David, Julien, Marc
General news:
- Two mainteinance done: MCE and CLIMATS
- ITk: wirebonding protection is passed. Thiziri is gone to CERN to do the metrology of the canopy
- New pre-production module: maybe 20-40 in the next months. Total. 5-10 in Paris?
Wirebonding:
- 33:
- 34: 2 wires didn't stay
- 35: done
- 36: cleaning is important. 1 wire not good. 9.6 mean pull force on group of wires but very bad on others (min 3.9!)
- 37: ongoing
- 38: big angle?
- 10h on 15/12 visit for microscope-camera for the WB machine
Assembly:
- Presentation by Matteo & Piero today at the Flex Attach
- 2 more modules today
Testing:
- 8-modules structure done. Little post-processing was needed but now we can mount it.
- Ask new power/data adapter boards?
- Interlock card done. To be installed.
- DCS code refactored: big improvements. Temperature fixed. Humidity capacitive sensor sill to be fixed.
Xray:
Il y a un compte-rendu associé à cet événement.
Les afficher.