Meeting ITk LPNHE
→
Europe/Paris
Higgs 12-22-2-28
Higgs 12-22-2-28
, ,
Description
Join Zoom Meeting
https://cern.zoom.us/j/94940524377?pwd=dnI4NnZUWGNMN1ZpRFJncFU1ZlMrQT09
Presents: Artur, Paul, Giovanni C, Francesco, Yann, Eric, Thibaud, Pascal, David, Marc, Julien, Philippe
General news:
- Eric Pierre agreed to help to keep track of the inventory of items (module components, consumables, key equipment) and keep track of shipping/receiving. Please help him!
- Module components are tracked also in the PDB, but consumables (even data pigtails!) are not
Wirebonding:
- Digital quads: 1x v2.4 (2 fils broken to be fixed, but it will be ready soon)
Metrology:
- Flex metrology / VI submitted and presented. Not reviewed yet
- Dummy metrology done (?). Presentation today. Submission soon.
- Bare module IV done + results sent to experts to understand diff wrt vendor IV
- Bare module metrology & visual inspection next
- Gelpak tool precommande status?
Assembly
- Our tool had an issue on two holes. Yann & Thibaud fixed it in our workshop
- Briefly tested yesterday. Need to understand how to obtain good calibration. Sensible to vibrations.
- Marco B and Francesco will go ahead with gluing tests tomorrow
- How many more tool to order? We need 3 to keep up the rate. 3+1 spare.
Testing
- LV distribution card. Assembly ongling, almost finished today. Cable bundles under assembly.
- LV intermediate card. Interlock test done. Design OK.
- DCS system
- Will receive Keithley 2000 with multiplexer card tomorrow. Try to read 4 chips at once instead of muxing them on the same input
- Digital module testing: ongoing, experience instabilities with one chip during very long tests (40 min). Francesco is modifying the program to fix this
- 1.2 gbps firmware!
- Data merging tested: still working, even better than before
- Qualification of testing
- Need to have an in depth look at what is required by the document
X-Ray
- Last components ordered (fixed light, better NTC for monitoring temperature) (? check precommande status)
- Cabinet is missing holding bars. Not easy to find them in catalog / stock. Custom made in lab?
- We need to finish the very last details (+ the fixed light that has been ordered) in order to take photos that needs to be adjoint to the Veritas report for the ASN
- 2-3 weeks to send the report to ASN -> 3 months to have a response
- Remi wants to organise a security commission of the lab to review our system
- We have everything from the ASN dossier
- Target: second week of may
Testbeam
- Paul & Thibaud will go and stay most of the period
- Francesco will referesh SCC testing procedures to Paul & Thibaud to be able to test our irradiated modules
- AIDAInnova TB meeting end may
Il y a un compte-rendu associé à cet événement.