65 nm meeting
→
Europe/Paris
Bat 20 - uElec (https://cern.zoom.us/j/69600555186?pwd=eVcxUTBnc2J0bWwyQ3RBM0ttZkN6Zz09)
Bat 20 - uElec
https://cern.zoom.us/j/69600555186?pwd=eVcxUTBnc2J0bWwyQ3RBM0ttZkN6Zz09
CE-65 ++ (Andrei):
- Sensors with 10^15 neq/cm2 and 10^16 neq/cm2 are already irradiated and we need to measure the dark current.
- Walter wants to compare with the APTS. A large discrepancy was already observed for leakage current.
- Measurements of the leakage current before irradiation. These measurements show very small values of dark current (< 2 fA) so: for this value, the dispersion is not considered as an issue . The precision is very low for one pixel. For APTS, the measurement can be done for 16 pixels (low statistics).
- Discussion was done on the sensors irradiated with 10e13 neq/cm2 that could used in beam test irradiations.
Moss design (Frédéric):
- Main work on DRC validation. Some errors are not well understood. Exchange with Tower is ongoing.
- No huge impact on submission (few days). Layout could be modified.
Most design (Szymon):
- The design is closed and clarification are expected for the final DRC.
- On Time ...
Analysis (Ziad):
- Variables names in Corryvreckan unabling to finish the analysis. Need to find the modification done and the new variables names in the ROOT files.
Readout (Jean):
- Ongoing projet for the asynchronous design.
- Discussion with in order to modify the design and a check is required for the parameters.
- Timing file is checked and things seem ok.
- Impact of the directions/placements of the blocs and metal layes (rectangles and arrows) should be better understood.
- Limitation in the pitch of the memory.
Il y a un compte-rendu associé à cet événement.
Les afficher.