- Tests
- Yitao looked on C and D version data, some modifications needed, obtained some plots on charge sharing
- still available a bit for the framework development if needed
- issue about the Y alignment remains (still about 1 um offset after changing the threshold)
- seems that alignment for Y-axis needs to be done on each submatrix separately
- does not happen in X, we don’t know why (connected to shift movement during runs?)
- issue about charge saturation, effect seen on APTS as well but not clear how to handle
- Ziad did progress on automated scripts, should be done within a month
- can then proceed with analysis of all runs
- about the way to align: it is also included as a step of the automated procedure
- Selection of one pixel in DAQ
- done by Kimmo for any pixel and acquisition of 65000 points in time
- Andrei and Kimmo preparing how to perform the analysis on such huge data
- Andrei is continuing simulation to reproduce signal shape and figure out what is the leakage current
- especially, try to extract individual pixel leakage current online to figure out dispersion
- RTS seen from wafeforms with same software,
- issue with limitation on DAQboard memory might make any quantitative estimation difficult
- Szymon will come to that study once the leakage current is done
- Yitao looked on C and D version data, some modifications needed, obtained some plots on charge sharing
- MOSS design, Xiachao
- version with LVS matching OK
- still issue with DRC though
- working on extraction of parasitics between row steering block and matrix, almost ready
- after parasitics extraction, timing simulation at CERN
- Jean doing simulation of power consumption with time for the priority encoder while it handles hits
- MOST design, Szymon
- similar to MOSS: LVS OK, DRC understanding on-going (no issue expected)
- verification kind of pending (especially top-level requires extraction…)
- all-inclusive (from hits to output) simulation with analogue tool is being setup, started by Szymon
==> Note that Walter leaves for vacation in 1 month, GDS needs to be ready by then!
- CE65v2 design, Andrei
- design was changed from layout of 1.5 months due match some custom design rules
- major functionalities added during that period:
- Pwell and Subtrate biases separated
- digital structure changed to program any sub-matrix read-out (discussed with Kimmo)
- Isabelle is doing extraction to check timing OK, almost done, should be fine
- was sent a week ago and Walter confirmed it is fine
- Readout architecture, Jean
- JOULE tool used to evaluate power and hit-rate from a code implementation (no layout)
- evaluation of the area required by the asynchronous readout
- currently evaluating timing (timing constraint file), not easy since design tools expect synchronous operation
=> NEXT meeting Wednesday September 7th