65 nm meeting
→
Europe/Paris
Bat 20 - uElec (https://cern.zoom.us/j/69600555186?pwd=eVcxUTBnc2J0bWwyQ3RBM0ttZkN6Zz09)
Bat 20 - uElec
https://cern.zoom.us/j/69600555186?pwd=eVcxUTBnc2J0bWwyQ3RBM0ttZkN6Zz09
- Tests, Sergey
- running at 10 MHz with ALPIDE telescope should be OK
- Kimmo has a procedure to load from USB
- Kimmo also introduced a filtering capacitor on carrier board, which improved the noise by 15%
but limited rising time (re-phasing sampling needed and work only with 10 MHz)
- Kimmo also introduced a filtering capacitor on carrier board, which improved the noise by 15%
- Szymon has still a minor things to review on software
- session at CERN needed to integrate (Sergey+Szymon): plan ~late April
- next beam test in May at CERN-PS
- discussion on who will handle analysis with corryvreckan
- chips available for testbeam a bit on the low side
- need to have additional boards => complete new sets with split 4
- For local lab measurement, what is missing:
- variant C
- large pitch with standard diode
- focus on split 4
- can be done after beam test but before end of June
- For irradiated sensor, plan to do during integration at CERN
- Mathieu needs to bring modified carrier boards
- Sergey reminded that 5 more proxy boards are expected from the current production
- MOSS design, Fred
- done with digital design and sent to CERN
- About standard cells modification required for stitching
- waiting guidelines
- team: Xiachao (Layout), Jean (Liberate), Fred (Abstract), master students?
- possibly IP2I designers will be involved (Luigi, Edouard, possibly)
- submission still planned for end of April, if no unexpected issues
- Jean is included in the project for power estimation
- no pressure for the submission
- For next submission, ER2
- let's think about it...
- MOST design, Szymon
- top level assembly has started
- schematic closed
- layout still in progress
- Szymon's part is biasing, under finalization
- also includes simulation at global level
- CE65v2, Andrei
- 18um pitch version is finished and has been sent to CERN
- verification not done thoroughly yet
- other versions already advanced but still on-going
- 18um pitch version is finished and has been sent to CERN
==> Next meeting in one week on March 23 (due to conflict on the 30th)