Test beam: proposal of program with FEV13s 3 Jun. 2019, T. Suehara (Kyushu) 0. Installation 1. Setup wo/beam 1.1 S-curve scan @ 150, 180 V *configuration: 150, 180, w. and wo. individual threshold tuning 1.2 Noise @ short and long pulse width 3. MIP@0deg 3.1 ch-by-ch calibration @ 150 & 180 V (need a day / voltage?) (+ pedestal study, tracking) 3.2 retriggering study with several thresholds 3.3 TDC study/timing resolution @ 150 & 180 V 4. MIP@60 deg 4.1 calibration @ 150 & 180 V (ch-by-ch not necessary) 5. Shower (to get large signal) 5.1 retriggering study with several thresholds 5.2 timing resolution by TDC 5.3 auto-gain selection (with several thresholds) 6. MIP @ 80 deg 6.1 square events